HARA Core connects smart meter, CT sensor, industrial PC and your existing BESS/PCS to perform automatic peak shaving, real-time monitoring and monthly system tuning.
Three compounding challenges are driving energy costs to unsustainable levels — and they're getting worse.
Maximum Demand charges account for 30–40% of your entire electricity bill. Every single kilowatt of peak demand costs up to RM 97 every month — whether you use it or not.
The JS-SEZ data centre explosion is overloading Johor's power grid. Frequent voltage fluctuations and unplanned outages are causing costly production downtime.
Carbon taxes from 2025, ESG reporting mandates, and international buyer requirements are forcing factories to decarbonise — fast. Those who delay pay more.
We do not need to replace your BESS. We connect to your meter and PCS, then control charge and discharge based on your factory load.
Smart meter and CT sensor read your factory demand continuously.
The industrial PC runs HARA Core locally and detects when demand is approaching your MD ceiling.
When needed, HARA Core sends charge/discharge commands to your PCS to shave the peak.
You can view load, battery status, peak shaving action, alerts and monthly performance.
We help update the system, tune settings and keep the hardware healthy under the annual care plan.
Note: Price is based on one site, one meter point and standard PCS communication. Extra meter points, difficult integration, hardware replacement and additional site visits are quoted separately.
BESS is the battery. HARA Core is the brain. It reads live demand, controls discharge, monitors performance and helps reduce Maximum Demand automatically.
Automatically decides when your BESS should discharge to protect your MD ceiling.
Reads real-time factory load from smart meter and CT sensor.
Connects to compatible BESS / PCS through available communication protocol.
Shows live load, BESS status, peak shaving action and system alerts.
🤖 HARA decision: Grid load is approaching the MD ceiling. BESS discharge activated to keep recorded demand under control.
If your factory already has a BESS, HARA Core connects to it and makes it smarter. If you do not have a BESS yet, we can propose a compatible C&I battery system based on your load profile, site condition and budget.
Place your EXEN-100-215 BESS front photo here.
Place your BESS open-door or internal system photo here.
BESS brand, final specification, certification scope, installation scope and pricing are subject to site assessment and compatibility review.
We focus on HARA Core integration: smart meter, CT sensor, industrial PC, dashboard and PCS communication.
We analyse your MD pattern and propose BESS only when the numbers make sense.
For customers who need a complete solution, HARA Core can be quoted together with BESS supply and integration.
Electrical installation is handled by qualified electrical personnel / contractor. HARA focuses on system control, dashboard and commissioning support.
Simple positioning: HARA Core is the brain. BESS is the muscle. We sell HARA Core first, and supply BESS only when needed.
RM25,000 setup for one site and one standard BESS/PCS integration. RM6,000/year system care plan for updates, dashboard hosting and remote support.
| Smart Meter | Included |
| CT Sensor Set | Included |
| Industrial Mini PC | Included |
| Industrial Router | Included |
| HARA Dashboard | Included |
| BESS / PCS Integration | Standard |
| Peak Shaving Logic | Included |
| Testing & Commissioning | Included |
| Dashboard Hosting | Included |
| Software Update | Included |
| Remote Support | Included |
| System Health Check | Included |
| Peak Shaving Tuning | Included |
| Extra Site Visit | Quoted Separately |
| Hardware Replacement | Quoted Separately |
| Extra Meter / PCS Point | Quoted Separately |
Our focus is simple: connect, monitor and control your energy system so your BESS can actually reduce Maximum Demand.
We sell the control system first, not just a battery cabinet. This keeps the solution lighter, smarter and easier to deploy.
We can work with compatible BESS / PCS brands when the communication protocol is available.
Factory owners can see load, MD trend, BESS status, system alarms and monthly performance from the dashboard.
We keep improving the control settings based on your real operating pattern.
HARA provides system control, dashboard and commissioning support. Electrical works are handled by qualified personnel / contractor.
If the customer does not have BESS yet, we can recommend a suitable system based on load profile and budget.
HARA AI TECH was founded with a single conviction: that the gap between world-class energy technology and Malaysian industry should not exist.
In Japanese, 腹 refers to the body's energy centre — the core from which all strength flows. We put intelligent energy at the centre of your operations.
To deliver AI-powered energy control systems built specifically for our grid, our tariffs and our factories — making peak shaving smarter, practical and measurable for Malaysian industrial facilities.
We envision a future where every Malaysian industrial facility uses energy intelligently — with clear visibility, automatic peak shaving and smarter BESS control.
Johor Bahru · Malaysia · Est. 2025
Send us your BESS / PCS brand, single-line diagram and latest TNB bill. We will check whether HARA Core can connect and perform peak shaving for your site.
Check My BESS Compatibility →HARA Core Package: RM25,000 setup · Annual System Care: RM6,000/year